Pepperhill Elementary School Parking Lot Repairs
E2 Development completed parking lot repairs and improvements at Pepperhill Elementary School, covering more than 83,000 square feet of surface area. The work included saw cutting and removing failed asphalt patches, patching with 2” hot mix asphalt, filling cracks, sealcoating, and restriping all existing parking lot lines to restore durability and functionality.
The project also addressed drainage by adding curb cuts and spillways in two locations. This work involved saw cutting curbs, installing concrete curb inlets, excavating trenches into wooded buffer areas, and placing nonwoven fabric with Class B rip rap to manage stormwater flow. Additional scope included restriping the rear track area to refresh its usability.
These improvements demonstrate E2 Development’s ability to deliver high-quality site work with careful coordination, attention to detail, and a focus on client operational needs. The successful completion of this project highlights our commitment to supporting educational facilities with safe, functional, and well-planned upgrades.
Scope of Work
- Completed parking lot repairs and improvements at Pepperhill Elementary School, covering more than 83,000 SF of surface area
- Saw cut and removed failed asphalt patches (approximately 250 SF) and patched with 2” hot mix asphalt
- Filled cracks across the parking lot and applied sealcoat after repairs
- Restriped all existing parking lot lines after sealcoating
- Added curb cuts and drainage spillways in two locations to improve stormwater management
• Saw cut curbs 24” wide and installed concrete curb inlets flush to edges
• Excavated 24” wide trenches into wooded buffer areas
• Installed nonwoven fabric and Class B rip rap to extend 25’ - Restriped the existing rear track area